Select a different country or region to see specific content for your location.

History

2022

Opening ceremony for the new production building in September 2022 with planned start of production in early 2023

The Brensbach and Neuhaus sites legally merge, with both sites now bearing the name into Röchling Medical Solutions SE.

2020

Ground-breaking ceremony for a 1.700 m² GMP D&C cleanroom production building, the highest investment of the Röchling Group to date

2018

Röchling HPT Hochwertige Pharmatechnik GmbH & Co. KG becomes Röchling Medical Neuhaus GmbH & Co. KG

Opening of the new building with a volume of 52,000 m³ and a building height of 23.6 m

2015

Acquisition by Röchling Group

270 employees, 11 trainees

2014

Construction of on-site training center (for career changers, trainees, in-house training, etc)

2013Construction and commissioning of Clean Room 4 inside logistics center (assembly department)
2012

Certification in accordance with ISO 50001 - Energy management

Construction and commissioning of Clean Room 3

Extension construction doubles square footage of logistics center

2011Certification in accordance with ISO 13485 - Medical technology
2010Construction and commissioning of Clean Room 2
2008Certification in accordance with ISO 15378 - GMP
2006

Certification in accordance with ISO 8317 - Child-resistant closure systems

Construction of new logistics center

2005

Certification in accordance with ISO 14001 - Environmental management

Introduction of injection stretch blow molding technology

Camera technology for hollow plastic bodies

2002

Production begins at our Neuhaus location - Acquisition of pharmaceutical and diagnostic production programs from Heinz Plastics (dating back to 1955)

65 employees, 2 trainees

 
Search

Refine Results

Contact

Share

Print to PDF

Select Website

roe_medical_teaser.jpg
System solutions and components for Diagnostics, Fluid Management, Pharma and Surgery

Medical