2022 | Opening ceremony for the new production building in September 2022 with planned start of production in early 2023 The Brensbach and Neuhaus sites legally merge, with both sites now bearing the name into Röchling Medical Solutions SE. |
2020 | Ground-breaking ceremony for a 1.700 m² GMP D&C cleanroom production building, the highest investment of the Röchling Group to date |
2018 | Röchling HPT Hochwertige Pharmatechnik GmbH & Co. KG becomes Röchling Medical Neuhaus GmbH & Co. KG Opening of the new building with a volume of 52,000 m³ and a building height of 23.6 m |
2015 | Acquisition by Röchling Group 270 employees, 11 trainees |
2014 | Construction of on-site training center (for career changers, trainees, in-house training, etc) |
2013 | Construction and commissioning of Clean Room 4 inside logistics center (assembly department) |
2012 | Certification in accordance with ISO 50001 - Energy management Construction and commissioning of Clean Room 3 Extension construction doubles square footage of logistics center |
2011 | Certification in accordance with ISO 13485 - Medical technology |
2010 | Construction and commissioning of Clean Room 2 |
2008 | Certification in accordance with ISO 15378 - GMP |
2006 | Certification in accordance with ISO 8317 - Child-resistant closure systems Construction of new logistics center |
2005 | Certification in accordance with ISO 14001 - Environmental management Introduction of injection stretch blow molding technology Camera technology for hollow plastic bodies |
2002 | Production begins at our Neuhaus location - Acquisition of pharmaceutical and diagnostic production programs from Heinz Plastics (dating back to 1955) 65 employees, 2 trainees |